WP1 : Platform for Broadband Architectures and Functions |
 |
Del n° |
 |
Name |
 |
Date due |
 |
More |
 |
 |
D1.1 |
 |
Target wireless standards assessment criteria |
 |
Sep 2006 |
 |
 |
 |
 |
 |
D1.2 |
 |
Analysis of the state of the art of the infrastructures and architectures used for FTTC and FTTA |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D1.3 |
 |
A catalogue of sub-mm-wave equipment/infrastructure to be pooled for JPB-AF |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D1.4 |
 |
Analysis of FTTH optical technologies and architectures on wireless communication infrastructures and networks |
 |
Nov 2007 |
 |
 |
 |
 |
 |
D1.5 |
 |
Performance of the TTD and passive picocell array beamforming systems |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.6 |
 |
Experimental and modelling study of OFDM and photonic vector generation/detection techniques applied to fibre based systems |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.7 |
 |
"Innovative system architectures for future communication and sensor networks; demonstrations and experiments" |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.8 |
 |
Broadband access network services requirements for photonic ADC and photonic microwave filters and validation |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.9 |
 |
Demonstration of all-optical mixer and filtering techniques for wireless over fibre applications |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.10 |
 |
Verification of Radio over Fibre experimental demonstration compliance with wireless standard requirements |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D1.11 |
 |
Report on “Results of field trial demonstration of combined fibre/wireless access network”. |
 |
Jan 2008 |
 |
 |
 |
 |
 |
D1.12 |
 |
Report on “Initial experimental results for flexible wireless systems using radio over fibre technology and optical networking techniques”. |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D1.13 |
 |
Report on “Filtering and mixing for transmission of UWB and WLANs signals over fibre” |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D1.14 |
 |
Report on “Verification of upgraded RoF experimental demonstrations compliance with wireless standards requirements”. |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D1.15 |
 |
Report on “Low-cost radio over fibre for current and next generation wireless systems" |
 |
Dec 2008 |
 |
 |
 |
 |
 |
D1.16 |
 |
Report on “Radio over fibre for future millimetre-wave and sensor networks" |
 |
Dec 2008 |
 |
 |
 |
 |
| |
WP2 : Platforms for Broadband Access Technologies |
 |
Del n° |
 |
Name |
 |
Date due |
 |
More |
 |
 |
D2.1 |
 |
Report on the improvements required for efficient low cost components |
 |
Sep 2006 |
 |
 |
 |
 |
 |
D2.2 |
 |
Catalogue of network facilities in the frame of the JPB-TD. This will include the technical part as well as the different procedures that have been set up to allow a smooth running of the JPB-TD |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D2.3 |
 |
Report on the performance of the integration of VCSELs in low cost radio-over-fibre systems. |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D2.4 |
 |
Fabrication of PD integrated with antenna |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D2.5 |
 |
First prototypes validating the multi-technology bridges created. |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D2.6 |
 |
Evaluation of second prototype 100 GHz (swept wavelength) analyser |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D2.7 |
 |
Results of round-robin measurement of photodiode and optical transmitters validating standardized testing techniques for optoelectronic components in broadband applications |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D2.8 |
 |
Definition of demonstrators for following joint research activities. This report will define the joint research activities that will have been pointed out as major impact demonstrators as platforms running validation and key. These demonstrators will be t |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D2.9 |
 |
Characterization results of low cost devices demonstrators |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D2.10 |
 |
Integration schemes for antenna and optical couplings of broadband components |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D2.11 |
 |
Results on the characterization of up to sub-millimetre wave optoelectronic transceivers |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D2.12 |
 |
Performance of developed components into system oriented measurements |
 |
Dec 2008 |
 |
 |
 |
 |
| |
WP3 : Integration and spreading of excellence |
 |
Del n° |
 |
Name |
 |
Date due |
 |
More |
 |
 |
D3.1 |
 |
Launch of the Website |
 |
Jun 2006 |
 |
 |
 |
 |
 |
D3.2 |
 |
CDROM for Summer School Year 1, 2006 (Germany) |
 |
Nov 2006 |
 |
 |
 |
 |
 |
D3.3 |
 |
CDROM Training Courses for Year 1 |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D3.4 |
 |
Workshop Proceedings & CDROM for Workshops WS1 and WS2 2006 (France, Germany) |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D3.5 |
 |
CDROM for Year 2 Training Courses |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D3.6 |
 |
Proceedings and CDROM for Summer School 2 (Hungary) |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D3.7 |
 |
Proceedings and CDROM for Workshop WS4 (Hungary) |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D3.8 |
 |
Proceedings and CDROM for Workshop WS6 (Sweden) |
 |
Dec 2008 |
 |
 |
 |
 |
| |
WP4 : Review and assessment of results |
 |
Del n° |
 |
Name |
 |
Date due |
 |
More |
 |
 |
D4.1 |
 |
Definition and setting up of integration indicator. Definition and setting up of the evaluation form used for workshops and summer-schools |
 |
Feb 2006 |
 |
 |
 |
 |
 |
D4.2 |
 |
Report: First results of performance indicators |
 |
Aug 2006 |
 |
 |
 |
 |
 |
D4.3 |
 |
Report: Second results of performance indicators |
 |
Feb 2007 |
 |
 |
 |
 |
 |
D4.4 |
 |
Report on assessment of results |
 |
Feb 2007 |
 |
 |
 |
 |
 |
D4.5 |
 |
Report: third results of performance indicators |
 |
Feb 2008 |
 |
 |
 |
 |
 |
D4.6 |
 |
Report on assessment of results: second year |
 |
Jun 2008 |
 |
 |
 |
 |
 |
D4.7 |
 |
Final report on collaborative and disruptive actions developed into ISIS |
 |
Dec 2008 |
 |
 |
 |
 |
| |
WP5 : Coordination, Management and Administration |
 |
Del n° |
 |
Name |
 |
Date due |
 |
More |
 |
 |
D5.1 |
 |
Report of the 1st General Assembly meeting |
 |
Jul 2006 |
 |
 |
 |
 |
 |
D5.2 |
 |
First periodic Report (activity report and updated JPA) |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D5.3 |
 |
1st Financial accounts for the European Commission |
 |
Dec 2006 |
 |
 |
 |
 |
 |
D5.4 |
 |
Report of the 2nd General Assembly meeting |
 |
Jun 2007 |
 |
 |
 |
 |
 |
D5.5 |
 |
Second periodic Report (activity report and updated JPA) |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D5.6 |
 |
2nd Financial accounts for the European Commission |
 |
Dec 2007 |
 |
 |
 |
 |
 |
D5.7 |
 |
Report of the 3rd General Assembly meeting |
 |
Jul 2008 |
 |
 |
 |
 |
 |
D5.8 |
 |
Third periodic Report |
 |
Dec 2008 |
 |
 |
 |
 |
 |
D5.9 |
 |
3rd Financial accounts for the European Commission |
 |
Dec 2008 |
 |
 |
 |
 |
| |